Free ISTQB-CTFL Exam Braindumps

Pass your ISTQB-Foundation Level Exam exam with these free Questions and Answers

Page 6 of 16
QUESTION 21

Which of the following activities are part of test planning?
I) Setting the entry and exit criteria
II) Determining the validity of bug reports
III) Determining the number of resources required
IV) Determining the expected result for test cases

  1. A. IV
  2. B. III
  3. C. I, III, IV
  4. D. I, II, IV

Correct Answer: B
Test planning is a key activity in the testing process that involves defining the objectives, approach, resources, and schedule of intended test activities. Setting the entry and exit criteria (I) and determining the number of resources required (III) are integral parts of test planning. Determining the validity of bug reports (II) is more aligned with test analysis or test management activities post-execution, and determining the expected result for test cases (IV) is part of test design. Therefore, options I and III (B) are the activities that belong to test planning.

QUESTION 22

Which of the following statements regarding inspection is NOT true?

  1. A. An inspection may be led by a trained moderator who shall not be the author.
  2. B. The main purpose of an inspection is to find solutions to the problems.
  3. C. An inspection can be performed by peers.
  4. D. An inspection shall follow a formal process based on rules and checklists with entry and exit criteria

Correct Answer: B
An inspection is a type of review that follows a defined process with formal entry and exit criteria and roles and responsibilities for participants. An inspection can be performed by peers with different roles, such as moderator, author, reviewer and scribe. The following statement about inspection is not true:
✑ B) The main purpose of an inspection is to find solutions to the problems. This statement is not true, as the main purpose of an inspection is to find defects or issues in a work product, not to find solutions to the problems. Finding solutions to the problems is a debugging or problem-solving activity that is usually performed by the author or developer after receiving the inspection report. The following statements about inspection are true:
✑ A) An inspection may be led by a trained moderator who shall not be the author.
This statement is true, as an inspection requires a moderator role who leads the inspection process and ensures that it follows the rules and standards. The moderator should be trained in inspection techniques and should not be the author of the work product under inspection, in order to avoid bias or conflict of interest.
✑ C) An inspection can be performed by peers. This statement is true, as an inspection involves peer review, which means that the work product under inspection is evaluated by people who have similar roles or expertise as the author, but who are not directly involved in creating or modifying the work product.
✑ D) An inspection shall follow a formal process based on rules and checklists with entry and exit criteria. This statement is true, as an inspection follows a formal process that consists of six main steps: planning, kick-off meeting, individual preparation, review meeting, rework and follow-up. Each step has defined rules and checklists to guide the participants and ensure consistency and quality. Each step also has entry and exit criteria to ensure that the prerequisites and objectives are met before moving to the next step. Verified References: A Study Guide to the ISTQB® Foundation Level 2018 Syllabus - Springer, Chapter 3, page 28-29.

QUESTION 23

Which of the following is an example of tasks most associated with the test design activity?

  1. A. The project manager updates the project schedule as key test tasks are completed
  2. B. Test data, derived from production data, is loaded into the test environment
  3. C. Every da
  4. D. the tester notes the status of his/her test cases in preparation for daily reports
  5. E. The identification of test execution and test automation tools

Correct Answer: D
Test design is one of the fundamental activities in software testing, focusing on how tests will be structured and what strategies will be employed. As per the ISTQB syllabus, identifying appropriate test execution and automation tools is a task closely associated with test design activities because it directly influences how tests will be conducted, managed, and executed efficiently. This activity involves deciding on the tools that will best support the testing goals and requirements.References:ISTQB Certified Tester Foundation Level Syllabus v4.0, Section 4.4 "Test Design Techniques".

QUESTION 24

Which of the following sentences describe a product risk?

  1. A. The application might not be able to provide the expected responsiveness under a load of up-lo 300 concurrent users
  2. B. Failure in acquiring an adequate and test automation tool
  3. C. A wrong configuration of the test environment that causes incidents related to the environment and not to the software under test
  4. D. The development team lacks knowledge of the technology on which the product is based

Correct Answer: A
This question relates to identifying product risks, which are potential problems associated with the product itself, such as software functionality, reliability, usability, and performance. Option A describes a scenario where the application might not meet performance requirements under specific conditions (up to 300 concurrent users), which directly impacts the product's ability to perform its intended function. This is a classic example of a product risk, as it concerns the product's quality and its ability to meet user needs. Options B, C, and D, on the other hand, relate to project risks, which are concerns related to the management and execution of the project, such as tool acquisition, environment configuration, and team expertise, rather than the quality of the product itself.

QUESTION 25

Which of the following statements about testing in the context of an agile (iterative- incremental) development model is correct?

  1. A. Unit test and acceptance test ate the most important tests to make sure that the system works as expected.
  2. B. Each iteration of testing has to be completely finished before a new Iteration of development starts.
  3. C. Regression testing is necessary whenever a new Increment Is added to the existing syste
  4. D. Only certain types of non-functional and explorative testing are performed.

Correct Answer: C
In the context of agile (iterative-incremental) development models, testing is integrated into the development process and occurs continuously throughout the lifecycle of the project. Agile testing emphasizes adaptability and the need for feedback at various stages of development.
Option C is correct because regression testing is indeed necessary whenever a new increment is added to the existing system. Agile development often involves frequent changes and additions to the codebase, which can potentially introduce new defects into previously tested code. Regression testing ensures that new changes have not adversely affected existing functionality.
Options A, B, and D present misconceptions about agile testing:
✑ A is incorrect because, in agile, all types of testing (unit, integration, system, acceptance) are important and occur throughout the iteration, not just unit and acceptance tests.
✑ B is incorrect because agile methodologies advocate for continuous integration and testing, where development and testing activities overlap and support each other throughout an iteration.
✑ D is incorrect because agile methodologies encourage a wide range of testing types, including both functional and non-functional, as well as exploratory testing, to ensure a comprehensive quality assessment.

Page 6 of 16

Post your Comments and Discuss ISTQB ISTQB-CTFL exam with other Community members: