QUESTION 11

Your customer has me following HPE Synergy setup
- Three frames fully populated with HPE Synergy 480 Gen10 Plus modules and 25Gb/s downlink speed formulating a single logical enclosure
- Two HPE Virtual Connect SE 100Gb F32 Module for Synergy
- Four HPE Synergy 50Gb interconnect Link Module
- Six HPE Synergy Virtual Connect SE 32Gb FC Modules The customer needs to add a frame.
Which statement about the expansion of this setup is true?

  1. A. The additional frame must have HPE Virtual Connect FC modules installed
  2. B. The customer can grow the existing logical enclosure up to 5 frames
  3. C. The customer has to create a new logical enclosure for the additional frame
  4. D. The additional frame cannot have 12Gb SAS connection modules installed

Correct Answer: C

QUESTION 12

An HPE Synergy customer needs to prevent a timeout and loss of communication during an external switch firmware upgrade.
Click the parameter that the customer should configure within an uplink set to meet this requirement
HPE0-S60 dumps exhibit
Solution:
HPE0-S60 dumps exhibit

Does this meet the goal?

  1. A. Yes
  2. B. No

Correct Answer: A

QUESTION 13

Your customer reports that they cannot deploy HPE Synergy compute nodes using HPE OneView for VMware vCenter Server (HPE OV4VC).
What should you check during troubleshooting process?

  1. A. If HPE OneView credentials are added in vCenter Server
  2. B. If an compute nodes are added to the vCenter Server
  3. C. If the HPE Oneview instance Is integrated with HPE OV4VC.
  4. D. If vCenter Server is licensed in the HPE Oneview interface

Correct Answer: B

QUESTION 14

Your customer wants to add dedicated Fibre Channel connectivity to the HPE Synergy frame running HPE Synergy 480 Gen10 compute modules, each with one CPU socket populated Currently they use two 12 Gb SAS switches and two HPE Virtual Connect SE 100Gb F32 Modules for HPE Synergy installed in third fabric.
What must be done to enable dedicated FC connectivity for this HPE Synergy frame?

  1. A. A second CPU must be installed for all HPE Synergy 480 Gen10 compute nodes.
  2. B. For Brocade switches, a logical interconnect group must be created in HPE OneView.
  3. C. For VC-FC modules, all of server facing ports must be property licensed.
  4. D. SAS switches must be moved to second fabric and FC modules Installed in the first one.

Correct Answer: D

QUESTION 15

Refer to the exhibit.
HPE0-S60 dumps exhibit
Which statement about this logical JBOD is true?

  1. A. This logical JBOD can be connected to multiple systems to formulate a snared datastore.
  2. B. After deleting this logical JBOD drives will he blocked for 12h m case this JBOD must be re-created
  3. C. After deleting this logical JBOD, its drives w not be available until a clean-up procedure 6 done
  4. D. This logical JBOD can be presented to the compute nodes in a different frame.

Correct Answer: C