Service resources at universal container UC frequently work in more than one service territory the current scheduling policy looks only at primary territory while us still want to optimizer to use the service resource primary when scheduling, UC also wants the scheduling policy to look at the resources secondary services territory Which two scheduling policy changes should a consultant recommend?
Choose 2 answers
Correct Answer:
BC
A service technician at Ursa Major Solar handles yearly maintenance checks. The job usually lasts 2 to 3 hours. Due to the lack of customer availability, many appointments are cancelled or need to be rescheduled at the last minute.
Which two features would be most helpful in aiding the dispatcher with updated schedules for technicians? Choose 2 answers
Correct Answer:
AB
Universal Containers operates in a highly regulated industry. Technicians must conduct quarterly inspections for all customers in their region. Each inspection should be completed within a single visit and include all installed assets on site. Which two Maintenance Plan settings should the Consultant recommend? Choose 2 answers
Correct Answer:
AC
Universal containers products need to be traceable form the factory to customer sites. The products are installed using disposable kits.
How should the consultant configure this?
Correct Answer:
C
Universal Containers wants to dispatch emergency work identified throughout the day that needs to be completed before lower-priority work.
What should the Consultant recommend to meet this requirement?
Correct Answer:
A