QUESTION 31

A test log is one of the documents that need to be produced in this domain in order to provide evidence of testing. However, the level of detail of test logs can vary. Which of the following is NOT an influencing factor for the level of detail of the test logs being produced? 1 credit

  1. A. Level of test execution automation
  2. B. Test level
  3. C. Regulatory requirements
  4. D. Experience level of testers

Correct Answer: D

QUESTION 32

During which stage of the fundamental test process is the testability of requirements evaluated?

  1. A. Test Implementation and Execution
  2. B. Test Planning and Control
  3. C. Evaluating Exit Criteria and Reporting
  4. D. Test Analysis and Design

Correct Answer: D

QUESTION 33

Of the following, select the best description of the fundamental test process:

  1. A. Planning and control, analysis, design, implementation, execution, evaluation of exit criteria and reporting, test closure.
  2. B. Executing tests, identifying and recording defects and preparing recommendation and closure reports.
  3. C. Controls, preparation of test cases, execution of test cases, execution of regression packs, communicating with developers, writing recommendations for release.
  4. D. Static testing, dynamic testing, defect reporting, reporting and closur

Correct Answer: A

QUESTION 34

How does software testing contribute to the quality of delivered software? [K2]

  1. A. By detecting and removing all the defects in the delivered code and ensuring that all tests adhere to the quality standards set for the project
  2. B. By measuring reliability of the software and ensuring that it is always above 99.99%
  3. C. By identifying root causes of defects from past projects and using the lessons learned to improve processes and thus help to reduce the defect count
  4. D. By detecting all deviations from coding good practice and ensuring that these are corrected

Correct Answer: C

QUESTION 35

The five parts of the fundamental test process have a broad chronological order. Which of the options gives three different parts in the correct order?

  1. A. Implementation and execution, planning and control, analysis and design.
  2. B. Analysis and design, evaluating exit criteria and reporting, test closure activities.
  3. C. Evaluating exit criteria and reporting, implementation and execution, analysis and design.
  4. D. Evaluating exit criteria and reporting, test closure activities, analysis and design.

Correct Answer: B
All other answers have at least one stage of the fundamental test process in the wrong sequence.