A Citrix Engineer is in the process of updating application layers.
Which three layer integrity messages must the engineer address before finalizing the application layer? (Choose three.)
Correct Answer:
BDE
Scenario: A Citrix Engineer recently changed the XML port in the Citrix Virtual Apps and Desktops site. After the change, the engineer observed that there is an XML communication port mismatch. The engineer immediately identified that the port was only changed on the Delivery Controller and no change was performed on the StoreFront server.
What are the two ways the engineer can change the port on the StoreFront server to match the changes made on the Delivery Controller? (Choose two.)
Correct Answer:
BC
Scenario: A Citrix Engineer manages a Citrix Virtual Apps and Desktops on-premises environment, which includes the following Citrix infrastructure servers running in the datacenter:
Two Citrix Gateway servers
Two StoreFront servers
Two Delivery Controllers
One Citrix Director server
One Citrix License Server
Two SQL servers
The engineer needs to move the Control Layer to Citrix Cloud as part of the business goals for this year. Which statement is true regarding Citrix Gateway for this environment?
Correct Answer:
B
Scenario: An organization has two Citrix Virtual Apps and Desktop Sites; Site A and Site B. Both Sites have their own StoreFront and Citrix ADC. The resource group is placed in Site B. A user from Site A tries to logon and launch an application from Site B.
The enumeration will occur through StoreFront Siteand the application launch will occur through Citrix ADC Sitewhen Optimal Gateway routing is configured.
Correct Answer:
D
Which two components are hosted in Citrix Cloud when using Workspace Environment Management (WEM) service? (Choose two.)
Correct Answer:
AC